BIM IN ASSET MANAGEMENT MONTHLY FORUM 22-10-2026
Date: 22 October 2026 · Duration: 1 hour 29 minutes
- Meeting Overview
The forum focused on improving the quality, accessibility and usability of as-built information and asset data throughout a building’s operational life. Discussions covered the as-built information consultation, practical handover processes, asset registers, verification of installed assets, and examples from school buildings.
- As-Built Information: Consultation and Next Phase
Anthony Taylor reported that the draft definition of as-built information had reached a level of consensus and received approximately 60–80 consultation responses, including technical questions and varied opinions.
- The team was reviewing the consultation feedback.
- Phase 1 focused on what information building operators need.
- Phase 2 would examine who should provide the information, how it should be delivered, who should verify it, and how it should remain current.
- The group expected Phase 2 to influence the original document, with a possible suite of documents emerging from the work.
- Making Handover Practical and Enforceable
Andrew Green shared lessons from the Government Property Agency and other projects, emphasising that good handover requires more than simply passing over files at practical completion.
- Contracts should require a two-way handover and give clients the ability to reject incomplete or unusable information.
- Facilities management (FM) teams should be involved before handover, rather than having to recreate or resurvey information afterwards.
- Project teams should provide core project data, while additional operational requirements should be identified and supplied separately.
- Information should be stored in an accessible, maintained environment and use familiar language and file names that operational teams can understand.
- Standardised Asset Registers and Data Management
Participants discussed the need for consistent, reusable asset information that supports maintenance, renewals, compliance and sustainability.
- A centralised, structured asset register could help keep information aligned as buildings and spaces change.
- Existing standards should be used appropriately for different purposes, rather than expecting one classification system to meet every need.
- Data should be trusted, owned, secure, up to date and accessible.
- Training and clear presentation are important because not every operational user is comfortable navigating BIM models or technical files.
- Andrew suggested presenting the updated Cabinet Office asset-management standard at a future forum; the possibility of a mid-November slot was raised.
- Verifying As-Built Information Against Reality
The school-building examples demonstrated why model data must be checked against what was actually installed.
- The Scottish primary school study compared information from a project delivered to a high BIMinAM standard with its operation and maintenance (O&M) documentation.
- The review identified discrepancies between records, including missing or incorrectly recorded assets and differences in equipment models.
- A coordinated Asset Information Model helped bring separate information sources together and investigate gaps.
- A further school visualisation demonstrated how models, detailed drawings and 360-degree imagery could help compare the installed building with the original model.
- Participants stressed that verification effort should reflect the importance of the asset or feature being checked.
- Golden Thread, Fire Safety and Affordability
The discussion highlighted the difficulty of turning large volumes of handover evidence into information that can actually support building safety and maintenance.
- Fire-stopping records and other compliance evidence need to be linked to the wider asset information model, rather than left in lengthy, disconnected documents.
- Poorly verified data creates additional costs because clients and FM teams may need to repeat surveys or collect information again.
- A consistent structure could help organisations—particularly schools and other cost-constrained sectors—share practical approaches instead of repeatedly developing their own solutions.
- Participants discussed using building information to support inspection, maintenance, compliance and future investment decisions.
- Recruitment and Next Steps
The forum invited participants to contribute to ongoing collaborative work.
- As-built project: Continue reviewing consultation responses and progress the next phase on delivery, responsibility and verification.
- Asset standards: Consider a future presentation on the updated Cabinet Office standard and relevant classification approaches.
- GTC initiative: Interested participants were asked to register their interest in the chat.
- Schools initiative: People with relevant school-sector experience were encouraged to identify themselves.
- Next forum: Expected in approximately three to four weeks. Participants who signed up for GTC or the as-built work would be contacted in the following days.
Key Takeaways
- Define operational needs first: Decide what information building operators need before determining how to collect and deliver it.
- Make handover enforceable: Contracts, acceptance criteria and early FM involvement are essential to improving information quality.
- Verify what was installed: Models and O&M documents must be checked against actual building conditions and equipment.
- Keep data usable throughout the building lifecycle: Information needs consistent structures, accessible storage, clear naming and ongoing updates.
- Collaborate on practical solutions: Shared standards and sector-wide approaches can reduce duplicated effort and improve affordability.